Unusual 2’6” gauge colliery line in Yorkshire
Geoff’s Pages
Click the thumbnails for a larger picture; use the slideshow and back / forward controls to navigate
Pictures taken 31 March 1980, on the line from Ledston Luck
colliery to Peckfield Colliery, where the coal was handled.
Peckfield was alongside the Leeds - Selby line at Micklefield.
The locomotives seen in action on this 2'6" line were at the time
almost brand new, built by Simplex Mechanical Handling
(formerly Motor-Rail) the previous year. They are no.18 (SMH
101T.018) and either 19 or 20 (101T.019 or 101T.020). The line -
and the pits - closed a year or two later; No 18 later saw service
(regauged to 900mm) on channel tunnel construction work,
before being rebuilt (and regauged again) by Alan Keef into the
locomotive now operating on the Leighton Buzzard line - their
"Beaudesert"